top of page

RAILWAY STATION GENOVA

It’s planned the construction of 250 m railway’s docks total length respectively in the direction of Torino and Genova. The provision of access from the Rivarolo road through a pedestrian walkway is planned. The planned parking area for bicycles and motorcycles is connected to the railway station through the pedestrian walkway.
A series of ramps, stairs and one underpass allow for the passenger fl ow from one dock to the other. A new entrance to the railway station through the Via Lepanto is planned too with relative stairs, ramps and underpass for passenger flow.
Prospected total length of the railway docks is of 500.00 m. Total Area of the Entrance domain is of 3,275.32 m2 Reference Speed 220 km/h.

 

bottom of page